Cruquius Bridge

DISA assisted Hollandia Infra with the subsea works during the installation of the new Cruquius Bridge. Between 2023 and 2025, the bridge is being renewed to be circular, energy-neutral, and low-maintenance, following the principles of Industrial, Flexible, and Demountable (IFD) construction.
Client Hollandia Infra
Period 2023 - 2025